The running-in period is an important link to ensure the normal operation of the small wheel loader, reduce the failure rate and extend its service life. However, at present, some users ignore the spe...
1. Before starting the small wheel loader, check whether the engine oil and water are sufficient. Put all the operating levers in the neutral position, and start the machine at a low speed after passi...
Use and maintenance of loaders 1. Since construction machinery is a special vehicle, operators should receive training and guidance from the manufacturer, have a full understanding of the structure an...
Introduction: After leaving the factory, loaders are generally required to undergo a run-in period of approximately 60 hours (sometimes called a "break-in period"). This is based on the articulated lo...